Hi,
It's a tiny suggestion:
To make more sense, "Month wait time" could be placed under "Minimum load", once "Minimum load" depends of "Month wait time" to work and it should obey a flow: first, you set a "Minimum load", after that, the "Month wait time". You start from top and go down.
Also, I think a % sign could be added to "Minimum load", to make clear what minimum load of: t, kg, rolls, time, %...?
I hope you all understood me. :)
[attachment deleted by admin]
THe MInimum lkoad can be changed via translator. THe order is easily reversed.
We already have a Portuguese translation that contains the % sign:
(http://forum.simutrans.com/index.php?action=dlattach;topic=1231.0;attach=3252;image)
Thanks