Skip to main content
Topic: r2411- Strange cost and maintenance cost of underground way (Read 3377 times) previous topic - next topic

r2411- Strange cost and maintenance cost of underground way

Currently the replacement of tunnels is very buggy (overbuilding of slower ways, wrong costs, wrong maintenance). This patch will fix this issues.

r2411- Strange cost and maintenance cost of underground way

Reply #1
r2411
Cost and maintenance cost of underground way is strange.

- If I click same tile twice,  it add cost and maintenance cost. Should not happen these.
- If I extend underground way with tunnel tool, it cost tunnel and way. Way cost should not happen.
- If I extend underground way with tunnel tool, its add unknown maintenance cost.


Re: r2411- Strange cost and maintenance cost of underground way

Reply #3
in rev 2412 :)

my first 'merge topics operation' successfully finished :D
Parsley, sage, rosemary, and maggikraut.

Re: r2411- Strange cost and maintenance cost of underground way

Reply #4
Solved in r2412. Thank you.