Skip to main content
Topic: [solved] - Tooltips: cost of extension building should be cst_multiply_post (Read 3090 times) previous topic - next topic

[solved] - Tooltips: cost of extension building should be cst_multiply_post

simutrans v100.0 & r2153

On the toolbar tooltips, cost of extension buildings show cost of generic_stop.
It should be cst_multiply_post.

A patch attached.

COST_CONSTRUCTION in wkz_station_building_aux
Code: [Select]
		sp->buche(umgebung_t::cst_multiply_post*besch->gib_level()*besch->gib_b()*besch->gib_h(), pos, COST_CONSTRUCTION);



[edit]
One more problem, cost of airstop is not cst_multiply_airterminal but cst_multiply_station.
updated patch.

Re: v100.0&r2153 - Tooltips: cost of extension building should be cst_multiply_p

Reply #1
Thank you